|
Geotechnical Engineering
Structural Engineering
|
|
|
Below are several pictures of the bridge deck demolition for ODOT Project # 419-96. CRT performed a stress analyses of the steel superstructure using load sequencing to ensure that the stresses due to live loads from the demolition equipment and dead loads from the existing structure were within ODOT specification.

Contact CRT for more information, or to make us part of your next ODOT contract.
|
|